Guide to Method Statements for the Installation of Storage Equipment on USB

£60.00

Description

This document is a guide to the considerations that must be made for the installation of racking and shelving systems. The guide is in three sections.

The first section gives outline information on health and safety legislation applicable to installation work, general guidance on equipment that will be used during the work, site management and training.

The second and third sections give guidance on good practice within the industry for installation of racking and shelving systems.

Sign up for the latest SEMA News